From ffad6cc20e25039c00fa988e7dfd2b1b69a0928b Mon Sep 17 00:00:00 2001 From: aiongg Date: Sat, 31 Oct 2026 04:25:47 +0000 Subject: [PATCH] docs: tidy wording --- ROADMAP.md | 4 ++-- docs/roadmap.md | 2 +- docs/target-app-parity.md | 4 ++-- 3 files changed, 5 insertions(+), 5 deletions(-) diff --git a/ROADMAP.md b/ROADMAP.md index 04396fffe..e7d8f0bba 100644 --- a/ROADMAP.md +++ b/ROADMAP.md @@ -196,7 +196,7 @@ Ranked; detail in [docs/roadmap.md](docs/roadmap.md) and [docs/gaps.md](docs/gap | 2026-10-01 | Renamed from DrawCraft to VectorCraft | | 2026-09-30 | Repository history begins | -The full pre-standard record of what landed is kept in [docs/roadmap.md](docs/roadmap.md#progress-log-before-the-progress-docs-standard). +The full earlier record of what landed is kept in [docs/roadmap.md](docs/roadmap.md#earlier-progress-log). ## Revision history @@ -223,7 +223,7 @@ The full pre-standard record of what landed is kept in [docs/roadmap.md](docs/ro | 2026-10-13 | minor | Bounded synthetic control input (#1709): counts and queued events validated before mutation; control-channel bursts yield between frames. Scores and hours unchanged. | | 2026-10-14 | minor | Progress log row for the merges of 2026-10-14 (#1641–#1808 as listed there) and Image Trace's #1647 and #1657; the 2026-10-13 row now says that a guide's position in the Transform panel (#1659) is not established by the documentation found and is kept as a convenience pending the owner's decision; headline numbers unchanged. | | 2026-10-13 | minor | Control transport deadlines (#1726): idle and partial clients and blocked replies release connection slots; parity scores and estimates unchanged. | -| 2026-10-10 | minor | Method aligned with the standard, no new evidence: full ready for real work is the additive weighted sum, ~62%; hours per audience; beta ~13 points away | +| 2026-10-10 | minor | Method changed, no new evidence: full ready for real work is the additive weighted sum, ~62%; hours per audience; beta ~13 points away | | 2026-10-10 | minor | Added the essentials-user readiness score (~75%) | | 2026-10-10 | minor | Ready for real work re-examined against the issue tracker and user feedback: 50% → 55% (full), 65% mainstream added; see target-app-parity.md | | 2026-10-10 | minor | Applied the core-workflow gate (docs/roadmap.md › Alpha gate): passes, stage stays alpha | diff --git a/docs/roadmap.md b/docs/roadmap.md index 86f4ea5a1..5f6245138 100644 --- a/docs/roadmap.md +++ b/docs/roadmap.md @@ -113,7 +113,7 @@ Checked 2026-10-10 from the code, tests and open issues; no workflow fails, so V Milestone estimates predate the 2026-10-10 re-measure for M1–M14; the area table in [target-app-parity.md](target-app-parity.md) is authoritative when they disagree. -## Progress log before the progress-docs standard +## Earlier progress log The ROADMAP's "last updated" line as of 2026-10-10, kept as the record of what landed up to then: diff --git a/docs/target-app-parity.md b/docs/target-app-parity.md index edcba39a9..aef1c3790 100644 --- a/docs/target-app-parity.md +++ b/docs/target-app-parity.md @@ -178,7 +178,7 @@ review parallelize less and need humans. ### Full Illustrator: additive weighted sum over the dimensions -The standard's method, the same in every app: a weighted **sum** over the dimensions, with written weights. +The method: a weighted **sum** over the dimensions, with written weights. Values are from [By dimension](#by-dimension). | Dimension | Weight | Value | Contribution | @@ -1638,7 +1638,7 @@ add-on. | 2026-10-11 | minor | Type advanced: Proportional Metrics in vertical type (`vpal`, #966) leaves the missing list; score and hours unchanged at this rounding (estimated) | | 2026-10-11 | minor | Shape Builder #893 fixed (planar-map faces share their corners exactly, so merges leave no seams); Path operations stays 80% and Shape Builder 70% while #937 is open (estimated) | | 2026-10-10 | minor | Merged main: initial live Revolve landed (#846). 3D 0% → ~8% (50–85 h), menu stubs 28 → 27; depth, readiness and totals unchanged within rounding | -| 2026-10-10 | minor | Method aligned with the standard, no new evidence: the full ready-for-real-work number is the additive weighted sum over the dimensions (~62%). The multiplicative 55% from earlier today is withdrawn, and the 50% before it was an unbroken-down judgement. Added hours to ~95% for each audience (full 340–560 h, mainstream 230–380 h, essentials 60–105 h). Beta distance is now ~13 points | +| 2026-10-10 | minor | Method changed, no new evidence: the full ready-for-real-work number is the additive weighted sum over the dimensions (~62%). The multiplicative 55% from earlier today is withdrawn, and the 50% before it was an unbroken-down judgement. Added hours to ~95% for each audience (full 340–560 h, mainstream 230–380 h, essentials 60–105 h). Beta distance is now ~13 points | | 2026-10-10 | minor | Added the essentials-user readiness score (~75%): 16 core features weighted, depth ~91%, discounted for launch, discoverability and files people send | | 2026-10-10 | minor | Second look at ready for real work at the owner's request: 50% → 55% full Illustrator, and a new mainstream-illustrator figure of 65%. Why: the old 25-point discount was a judgement with no breakdown. Now each discount is written down and checked against the tracker: 86% of 79 core-drawing issues closed, 20 of 28 `.ai`/EPS issues fixed and the open ones about structure, praise from 15 people, no reports of switching; dimensions a typical illustrator rarely hits are taken out of readiness. Feature breadth, depth and hours unchanged | | 2026-10-10 | minor | Stage checked against the core-workflow gate: passes, stays alpha |