Files
aleleba 4d840553d6 Phase 6.4.27: re-measure g5-08-reparacion-grises to complete gate 5 full on v2b-NVFP4
g5-08 was pending since it fell mid-run when Penpot's plugin disconnected
("No Penpot plugin instances are currently connected"). Re-run in isolation
via GATE5_ONLY, per the established pattern: score 64.7, clean veto, no
placeholder greys. Gate 5 full mode on v2b-NVFP4 is now complete (10/10):
mean score 28.2 (threshold 65), clean veto 6/10, prompts>=60 2/10, pizzeria
landing 47.8 (threshold 60) -- verdict: DOES NOT APPROVE.
2026-08-05 01:49:59 +00:00

71 KiB
1993x722px