* E21: require release font coverage and stabilize capture deadline tests
* E21: separate capture, IME and field-save regression phases
* M0: correct the migration qualification reference
* M-egui037: document input lifecycle and UI regression contracts
* M0: correct egui 0.37 status docs and stabilize join-code regression
---------
Co-authored-by: Dylan M. Taylor <dylan@dylanmtaylor.com>
Co-authored-by: Codebuff <noreply@codebuff.com>
* Dev profile: line tables for workspace crates, no debug info for dependencies
* Tests: one integration-test binary per crate with several test files
* xtask ci: nextest, doctests, tests without examples, --keep-going; add xtask test
Main's file dialogs answer asynchronously now (they no longer re-enter the
event loop on macOS); the menu item takes the path in a callback, and the test
draws a frame to let the dialog answer.