Commit Graph
4 Commits
Author SHA1 Message Date
Brandon Thomas 36eaa7e051 Merge pull request #1477
Inserts in the master views: insert.dateTime fills the master's date placeholder; answers say a master or layout was edited (part of #298)

# Conflicts:
#	crates/engine/src/tests.rs
2026-10-30 15:41:59 -04:00
Dylan M. Taylor 1a203c4a73 Refactor engine for strict Clippy checks 2026-10-28 06:02:27 +00:00
Zach BerryandClaude Fable 5.1 6a1b8f1e39 [ZZ1] insert.dateTime in the Handout/Notes Master view fills the master's date placeholder
PowerPoint: Header and Footer > Notes and Handouts > Date and time puts a date field in the
date placeholder of the notes and handout masters, and every handout and notes page shows it.
Before, with no text caret the command wrote the current slide's date placeholder (design
.headerFooter) even in those views, so the handout PDF showed nothing. Now it writes the selected
date placeholder, else the master's own, as a field (update) or plain text, answers where:
master, and refuses (changing nothing) when the master has no date placeholder.

Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-27 18:55:41 -05:00
aiongg 97b98767f1 refactor(engine): split cmd/insert.rs into cmd/insert/{picture,album,chart,text_fields,links}.rs 2026-10-26 22:08:44 +00:00